Current information on queues and traffic at the Gotthard (A2)

North portal webcam
Location: A2, before Göschenen, south direction (Gotthard tunnel).

South portal webcam/strong>
Position: A2, very close to the entrance to Airolo, south direction (Ticino). The entrance to the Gotthard tunnel is located below left.

Travelers departing from the Swiss plateau (Travel time without queues from Bern to Chiasso).

Path Time Km
through the A2 Gotthard tunnel 03h00 302 km
through the A2 and the passes of Oberalp and Lucomagno 04h15 348 km
via the A6 / A8 and the passes of Grimsel, Furka and Novena 03h50 276 km
via the A6 / A8 and the Susten and Gotthard passes 03h55 280 km
via the A6 / A6 and the passes of Susten, Oberalp and Lucomagno 04h45 310 km
via the Lötschberg loading station and the Sempione pass 04h45 282 km

Travelers departing from the Zurich region (Journey times without queues from Lucerne to Chiasso)

Path Time Km
through the A2 Gotthard tunnel 02h30 206 km
through the A2 Gotthard pass 02h50 211 km
through the passes of the Brünig, Susten and San Gottardo 03h30 226 km
through the passes of the Brünig, Susten, Oberalp and Lucomagno 04h00 230 km
through the passes of the Brünig, Grimsel, Furka and Novena 04h00 230 km

A2 Closures of the Gotthard road tunnel

Date Duration Time Disturbance / Diversion
18. – 22.09.2017 4 night Lu – Ve 21.00 – 05.00 Il traffico delle auto sarà deviato sulla strada del passo, ha indicato oggi il canton Uri. I veicoli superiori alle 3,5 tonnellate saranno per contro bloccati prima, a nord come a sud.
25. – 29.09.2017 4 notti Mo – Fr 21.00 – 05.00 The traffic of cars will be diverted on the road of the pass, today indicated the canton Uri. Vehicles exceeding 3.5 tonnes will be blocked first, in the north and in the south.
02. – 04.10.2017 2 notti We – Fr 21.00 – 05.00 The traffic of cars will be diverted on the road of the pass, today indicated the canton Uri. Vehicles exceeding 3.5 tonnes will be blocked first, in the north and in the south.

H2 Passo del San Gottardo

The Gotthard Pass is a possible alternative for transit in the event of queues. The pass is usually closed in winter from November to May.

Due to a long-term construction site between Göschenen and Andermatt it will be difficult to foresee occasional inconveniences on this section (until 2019).

Related Posts